Fleet · CCUs

DNV cargo carrying units (CCUs) for rent in Mexico

Offshore baskets, containers, reefers and tanks, with DNV 2.7-1 certified units in every family, GPS-tracked and held in our Altamira and Villahermosa yards.

1,200+
CCUs in Mexico
4' – 105'
Basket lengths
18–500 BBL
Tank capacities
DNV 2.7-1
Certified units in every family

What is a CCU?

Built to be lifted offshore

A cargo carrying unit (CCU) is a portable unit built to carry equipment and supplies between supply vessels and offshore installations, lifted by crane in open sea. DNV 2.7-1 and EN 12079 set how CCUs are designed, built, tested, certified and inspected, which is why International Oil Companies specify them.

Certified, tracked and delivered

Certified and inspected

DNV units are certified by an ASNT-TC-1A inspector following DNV 2.7-1, with records held per serial number.

Our standards →

GPS on every unit

Tracked by satellite across Mexico, so you know where your units are and when they last moved.

How GPS tracking works →

Delivered to every Gulf port

From Altamira / Tampico and Villahermosa, with the paperwork prepared before a unit moves.

Logistics and coverage →

FAQ

CCU rental questions

What is a CCU?

A cargo carrying unit: a portable unit built to carry equipment and supplies between supply vessels and offshore installations, and lifted by crane in open sea. DNV 2.7-1 and EN 12079 set how they are designed, built, tested and certified.

Which CCUs do you rent in Mexico?

Offshore baskets from 4' x 4' to 32 m (105'), containers and reefers, and tanks from 18 to 500 BBL. Every type is listed on this page, with its spec sheet where Tiger publishes one.

Are your CCUs DNV certified?

Units marked DNV in the lists are certified to DNV 2.7-1 / EN 12079 and inspected by an ASNT-TC-1A inspector. Other units are built to the specification shown on their spec sheet.

Can I see the spec sheets?

Yes. Items marked PDF open the Tiger Offshore spec sheet, with dimensions, weights and drawings.

Need CCUs for your next campaign?

Send the equipment list, the port and the dates. We come back with availability and certification status.